Design, planning and implementation of test centers and special test benches

Are you planning to build your own test center and want a strong partner at your side?

As a general contractor , we take on the planning and realization of your construction project. In addition to our technical expertise, we will impress you with our distinctive competence in project coordination and interface management. We will accompany you competently, efficiently and safely through all project phases.

You benefit from services from a single source: from the initial phase to seamless planning and implementation.

 

We take care of the technical project management

You benefit from our comprehensive technical project management and technical project control. We ensure smooth project execution, efficient processes and the successful implementation of your project through to the finished product. We ensure that you meet your deadline, quality and cost targets and coordinate your suppliers and contractors in all project phases. We also define and track the necessary project-related approval and documentation processes and manage your internal workflows on request.

We identify the applicablestandards such as DIN EN ISO/IEC 17025, EN 9100, ISO 14001, ISO 9001 and take these into account throughout the entire development process.

Consulting and studies

Good requirements management is a fundamental part of the planning process and is crucial to the success of your project. We work with you to identify your specific requirements.

We advise you on the selection of technologies and provide you with a sound decision-making basis for the subsequent planning phase.

We support you with the preparation of technical and economic feasibility studies and technical concept studies. We also carry out expert opinions and market research. We carry out rough scheduling for your project, create a rough concept, carry out a cost estimate and create your project manual.

Specialist planning

Based on the concepts and studies created, we draw up a technically sound plan and specify the requirements for the structural infrastructure and other interfaces of your test facilities or test laboratory.

We complete the planning phase with the creation of CAD detailed plans, specifications, risk assessments, cost calculations and implementation plans and create the basis for transparent technical and economic procurement and realization of your project.

Procurement management

We help you select a suitable supplier. Our services in the context of contract award management include comprehensive technical tender and contract award support. We are available to answer technical and organizational questions from bidders and the client, conduct bidder interviews and bid evaluations and compare these with the requested services. At the end of the award phase, you will receive a technical and commercial award recommendation for the selection of a suitable supplier for your construction project.

The order review concludes the award management and enables a smooth transition to the final implementation phase.

Realization

Once the suppliers have been commissioned, we support you with technical construction and project supervision. This includes the technical supervision of your supplier in the context of the preparation of his work and assembly planning as well as the coordination with you as the client, the other suppliers and trades. At the end of the realization phase, we carry out the technical acceptance tests at the supplier's andclient'spremises, check the result documents and - if necessary - draw up declarations of conformity and CE certifications.

In addition to providing technical project support, we check compliance with the planned costs as part of cost tracking and are responsible for the entire change management process. We also offer instruction and training of your employees by our experts on the finished test bench.

General contractor

As a general contractor for test centers, we offer you comprehensive solutions from a single source (one-face-to-the-customer). From conception and planning to implementation and turnkey handover, we ensure that your project runs smoothly. Our experts develop customized, innovative test bench solutions that meet the highest quality standards and are optimally tailored to your individual requirements.
As an independent and manufacturer-neutral general contractor, the selection of suppliers is based purely on technical and economic aspects. By working closely with you throughout the entire process, we guarantee maximum efficiency and on-time completion. Benefit from our many years of experience and our commitment to excellence to expand your testing capacities and increase your competitiveness.

Project references

  • System & development test bench for chassis

    The assignment

    Design, development and realization of a turnkey chassis drum test bench for chassis analysis, validation and HIL simulation


    The results

    • Turnkey landing gear test rig for simulating taxiing and rolling processes up to 400 km/h
    • 5 m drum for simulating low-frequency runway irregularities up to 2 Hz
    • Specification of the vertical loads on the landing gear via a carriage with 900 kN hydraulic cylinder
    • HIL simulation


    The solution

    • Conception/realization of test system
    • Specification/contracting of the trades
    • Formulation of requirements for construction and infrastructure
    • Supplier and interface management
    • System integration/commissioning
    • Construction site coordination/supervision on site in China
    • Acceptance by suppliers/customers


    The added value

    Globally unique chassis drum test rig for investigating typical chassis effects such as "shimmy" and "gear walk" under reproducible conditions and vertical ground excitation

  • Specialist planning, contract award and realization support for large test benches

    The assignment

    Specialist planning and overall planning responsibility for the large test benches (sound measurement rooms, air conditioning, roller and axle test benches, measurement test benches, central hydraulics)


    The results

    • High-performance roller acoustic measuring room with climatic chamber/with roller test bench
    • Acoustic simulator
    • Vibration simulator
    • Static/dynamic structural analysis
    • Axle test rigs Fatigue strength with/without air conditioning
    • Chassis cutting force test rig


    The solution

    • Concept development/detailing
    • Requirements management
    • Preparation of approval planning
    • Specifications/performance specifications
    • Implementation planning for room-in-room solutions and ventilation technology
    • Award supervision and support
    • Concept and design approval


    The added value

    • Comprehensive concept and planning approach for innovative test benches
    • Assumption of the complex coordination work in a technically and organizationally complex new construction project
  • Feasibility study for a test center

    The assignment

    Preparation of a feasibility study on the technical feasibility of the requirements of a climate technology test center


    The results

    • Confirmation of the feasibility of the developed concept
    • Creation of an initial 3D model of the testing technology as a basis for preliminary building planning
    • Media requirements list as the basis for TGA planning
    • Cost estimate as the basis for further budget planning


    The solution

    • Carrying out a requirements analysis
    • Concept development based on the customer's requirements
    • Elaboration and definition of the elaborated technical requirements for the inquiry with potential system manufacturers
    • Basic determination of the expected media requirements
    • Preparation of a cost estimate


    The added value

    • Successful feasibility analysis as the basis for the next planning phase
    • System concept development based on many years of experience in the construction and operation of air conditioning test systems combined with specialist planning expertise at the interface between construction and technical building equipment
  • General contractor for a large test bench

    In a nutshell - the requirement

    Design, development and delivery of a multiaxial complete vehicle test bench for durability testing of wheeled vehicles (weight from 2 t to 45 t, 4 x 4 to 8 x 8 drives)

    The results

    • Turnkey test system for testing military wheeled vehicles with subsystems
    • Test system (4 x 6 dof axle test stands, 8 x 1 dof hydrostamp)
    • Hydraulic/cooling system (5,000 l/min)
    • Swing foundation (2,000 t)
    • Vehicle lifting system
    • Load programs for vertical dynamics
    • Calculation of life cycle costs (LCC)

    The solution

    • Planning/realization as general contractor
    • Specification/contracting of the trades
    • Formulation of requirements for construction and infrastructure
    • Supplier and interface management
    • System integration/commissioning
    • Acceptance by suppliers/customers
    • Instruction/training
    • Method development

    The added value

    Cost and time savings through shorter testing times, reduction of road tests and increased reproducibility

    https:// www.youtube.com/watch?v=C7TMaRGkQO0

Externer Inhalt - YouTube Video

An dieser Stelle finden Sie Inhalte eines Drittanbieters, die Sie mit einem Klick anzeigen lassen können.

Mit dem Laden des Videos können personenbezogene Daten an den Drittanbieter übermittelt werden. Mehr Informationen finden Sie in unseren Datenschutzbestimmungen.

Your partner for the realization of sophisticated test infrastructures
Dr. Ahmed Abou-El-Ela

Head of Test Centers

test-facility@iabg.de
Contact